More

    Tower Bridge shut down after man scales railings | UK News

    Published on:

    [ad_1]

    Tower Bridge was temporarily shut down after a person climbed up the railings.

    The incident saw the bridge in central London being “closed to traffic and pedestrians” with the public being urged to “avoid the area where possible”.

    Firefighters attended the scene and raised a ladder so rescuers could communicate with the man, who was wearing a hooded top.

    Other reports said river traffic on the Thames had also been disrupted.

    Small crowds gathered near the bridge watching as the events unfolded.

    Pic: Dale Matthew Hudson
    Image:
    Pic: Dale Matthew Hudson

    Less than two hours after reports of the incident first emerged, City Of London Police said the man had “safely come down” and the authorities would be reopening the bridge.

    The incident was first reported at the end of Monday morning. The man was back on the ground just before 1pm.

    The force said: “The man has safely come down from the railings on Tower Bridge.

    “The bridge will reopen shortly. Thank you for your patience.”

    Monday’s disruption comes after a man spent more than 16 hours perched on the Elizabeth Tower – which is home to Big Ben – in central London on Saturday.

    Westminster Bridge was closed to traffic during the incident as emergency services attended the scene and tourists gathered to watch.

    Daniel Day, 29, of Westcliff-on-Sea in Essex, faces charges of intentionally or recklessly causing a public nuisance and trespassing on a protected site.

    [ad_2]

    Source link

    Related

    Leave a Reply

    Please enter your comment!
    Please enter your name here